Biomass feasibility study: SolTuna and KFPL

Development of a biomass availability model and biomass scenario testing.

Project overview

Strongim Bisnis partnered with SolTuna and Kolombangara Forest Products Limited (KFPL) to explore a biomass-based solution for reducing reliance on diesel in SolTuna’s fish processing operations in Noro, Solomon Islands. This initiative leverages KFPL’s FSC-certified plantations, emphasising sustainability, local resource utilisation, and community benefits.

SolTuna’s operations heavily rely on diesel, which is costly and environmentally taxing due to the greenhouse gas emissions generated. Diesel prices rose by 53% between 2021 and 2023, increasing operational expenses. The goal of the project was to assess the feasibility of replacing diesel with biomass for steam and potentially electricity generation. Margules Groome Consulting with our consulting partner Whirika Consulting were successful in winning the contract for an initial feasibility study.

Solution

Margules Groome Consulting, with Whirika Consulting, conducted a feasibility study to analyse replacing SolTuna’s diesel-powered boilers with a biomass system. This solution could significantly lower carbon emissions and operational costs while creating economic opportunities for the local community.

Two scenarios were evaluated:

  • Scenario 1: Biomass for steam production only.
  • Scenario 2: Biomass for combined steam and electricity generation.

The project explored the use of harvest residues and thinning operations from KFPL’s plantations. A lack of data meant that Margules Groome with the help of KFPL staff needed to collect estimates of the available woody biomass. This data was combined with other data supplied by KFPL to develop a Tigermoth biomass availability model. Whirika Consulting collected and analysed data from the current boiler fuel demand, this was used to specify and cost out new biomass boilers. The data collected as part of the project was combined into a bespoke economic model to test each scenario’s economic feasibility.

Results

The results of the feasibility study showed the installation of the biomass boiler at Soltuna’s Noro fish processing factory would have significant positive impacts: financially for both Soltuna and KPFL, environmentally through reduction in carbon dioxide emissions; and employment opportunities for the community. This project has the potential for job creation in biomass harvesting and logistics, there are potential opportunities for community-led biomass plantations providing regular income for local communities. The study concluded that Scenario 1 is more viable due to its lower capital requirements and reduced risk.

Outcome

SolTuna, KFPL and Strongim Bisnis hope to place the study at the forefront of sustainable innovation in the Pacific. Join us in making industries eco-friendlier and more resilient while supporting local communities.

Explore the latest updates on the global economy, forest industries, and markets, along with regional insights into wood products and timberland trends….
Climate-related financial disclosures are rapidly becoming part of mainstream business reporting. Yet one of the greatest challenges organisations face is moving from climate projections and…
Forest management has always been spatial. Soils, topography, productivity, species suitability and access vary across an estate, and management decisions have long reflected these differences….
Explore the latest updates on the global economy, forest industries, and markets, along with regional insights into wood products and timberland trends….
Climate-related financial disclosures are rapidly becoming part of mainstream business reporting. Yet one of the greatest challenges organisations face is moving from climate projections and…
Forest management has always been spatial. Soils, topography, productivity, species suitability and access vary across an estate, and management decisions have long reflected these differences….

Sign up to receive publications

All fields are required.